Silver Jubilee Park

By Rob Morris (legacy user)8/7/2014 11:37Tue Jul 8 11:37:14 2014

Views: 3062

Works are due to start next Monday with the removal of top soil. Then a sub base of various layers of stone and a kerb edge will be installed. Finally the carpet is fitted and then after 100 hours of use the surface is tested so we have the FIFA accreditation required. The whole process should take 9 weeks weather permitting.